外国黄片网站黄色片一级视屏|国产视频-日美不卡在线视频|看欧美1级1级1级生活片儿|青青草人人插青青操干日AV|青青操在线免费观看av|一级成年国产中文字幕av一|美女黄黄视频骚货网站在线观看|欧美一级做一级a做片|少妇高潮一区二区三区99|丁香五月蜜桃久久久亚洲精品成人

 
Putin opens Crimean Bridge
                 Source: Xinhua | 2018-05-16 03:35:02 | Editor: huaxia

Russian President Vladimir Putin attends a ceremony opening the Crimean Bridge and meets with the builders before crossing the bridge in Crimea, Russia on May 15, 2018. (KREMLIN PHOTO)

MOSCOW, May 15 (Xinhua) -- Russian President Vladimir Putin officially opened the Crimean Bridge that links southern Russia and Crimea on Tuesday.

The construction of the bridge over the Kerch Strait between the Black and Azov seas started in 2015 following the incorporation of the former Ukrainian republic in 2014 and consequent deterioration of relations between Moscow and Kiev.

The cost of the project is estimated at around 228 billion rubles (about 3.6 billion U.S. dollars), according to the project's website.

The 19-km bridge is the largest in Russia built so far. It consists of two parallel routes for automobiles and trains.

The automobile track consists of four lanes. Up to 40,000 cars a day may cross the bridge travelling at a speed of up to 120 km per hour.

Back to Top Close
Xinhuanet

Putin opens Crimean Bridge

Source: Xinhua 2018-05-16 03:35:02

Russian President Vladimir Putin attends a ceremony opening the Crimean Bridge and meets with the builders before crossing the bridge in Crimea, Russia on May 15, 2018. (KREMLIN PHOTO)

MOSCOW, May 15 (Xinhua) -- Russian President Vladimir Putin officially opened the Crimean Bridge that links southern Russia and Crimea on Tuesday.

The construction of the bridge over the Kerch Strait between the Black and Azov seas started in 2015 following the incorporation of the former Ukrainian republic in 2014 and consequent deterioration of relations between Moscow and Kiev.

The cost of the project is estimated at around 228 billion rubles (about 3.6 billion U.S. dollars), according to the project's website.

The 19-km bridge is the largest in Russia built so far. It consists of two parallel routes for automobiles and trains.

The automobile track consists of four lanes. Up to 40,000 cars a day may cross the bridge travelling at a speed of up to 120 km per hour.

010020070750000000000000011105091371815481