外国黄片网站黄色片一级视屏|国产视频-日美不卡在线视频|看欧美1级1级1级生活片儿|青青草人人插青青操干日AV|青青操在线免费观看av|一级成年国产中文字幕av一|美女黄黄视频骚货网站在线观看|欧美一级做一级a做片|少妇高潮一区二区三区99|丁香五月蜜桃久久久亚洲精品成人

(Multimedia) 1st LD: 2 sides of China-Russia highway bridge connected

Source: Xinhua| 2019-05-31 16:42:40|Editor: huaxia
Video PlayerClose

Builders work at the construction site of Heihe-Blagoveshchensk road bridge at the border of China and Russia, June 21, 2017. (Xinhua/Wang Jianwei)

HARBIN, May 31 (Xinhua) -- Two sides of the first highway bridge connecting China and Russia across the Heilongjiang River were joined together on Friday.

Measuring 1,284 meters long and 14.5 meters wide, the bridge across the Heilongjiang River, known in Russia as the Amur River, stretches from Heihe, a border city in northeast China's Heilongjiang Province, to the Russian city of Blagoveshchensk.

It is a key part of a 19.9 km-long highway project that starts from Jilin-Heilongjiang expressway and ends at a highway in Blagoveshchensk. An estimated 2.47 billion yuan (about 358 million U.S. dollars) will be spent on the whole project, with 566 million yuan from China and 1.9 billion yuan from Russia.

To ensure project quality, steel girders that withstand as low as minus 60 degrees Celsius were used by Chinese and Russian builders in the frigid region, together with 60,000 sets of steel bolts with high weatherability for connection.

The highway bridge was first proposed by China and Russia in 1988. Construction of the bridge began in December 2016, and is expected to complete in October.

With the help of the bridge, the passenger flow between the two cities is expected to reach 1.4 million by 2020, triple the current figure. Cargo volume will see a 10-fold increase to 3 million tonnes. Enditem

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001381063031